Residential Construction Schedule Template – Dynamic Excel & Google Sheets Gantt Chart
$84.95
A self-calculating residential construction schedule and Gantt chart for Microsoft Excel and Google Sheets — built for home builders and remodelers. Enter your tasks, durations, and dependencies and the start dates, finish dates, and timeline bars build themselves. Switch between 5-Day, 7-Day, Weekly, and Monthly views in one click, and set whether you work holidays, Saturdays, or Sundays. Comes pre-loaded with a complete home-building task list.
Description
Build a professional residential construction schedule in minutes — not days.
This isn’t a static spreadsheet. It’s a fully dynamic construction scheduling template that recalculates the entire Gantt chart the moment you type. Set your project start date, enter your tasks, and watch start dates, finish dates, durations, and the timeline bars build themselves.
Why home builders and remodelers love it
- True task dependencies. Link any task to a predecessor and choose the relationship — Finish-to-Start, Start-to-Finish, Start-to-Start, or Finish-to-Finish — from a drop-down, and the schedule reflows automatically.
- Work-calendar aware. Tell it whether you work through Holidays, Saturdays, and Sundays and every date recalculates around your real working days (holidays are built in).
- Four views, one click. Flip the whole chart between 5-Day Daily, 7-Day Daily, Weekly, and Monthly from the Startup tab.
- Live progress tracking. A % Complete entry shades each bar (blue = done, orange = remaining), and a green Today line shows exactly where you stand.
- Automatic roll-ups. Group heading rows total their tasks’ duration, % complete, and start/finish dates for you.
- Works in Excel and Google Sheets. Separate ready-to-use files for each are included.
- Pre-loaded residential task list. Comes populated with a complete home-building sequence (site work, foundation, framing, dry-in, exterior finishes, rough-ins, insulation, drywall, paint, cabinets, finish trades, landscaping, and final acceptance) — edit, add, or delete to match your job. Three years of calendar are built in.
What you get
- The Residential Construction Schedule Template in two ready-to-use formats — a Microsoft Excel file and a separate Google Sheets file
- A Quick Start Guide (PDF)
- Built-in Help & Info tab with full instructions
Compatibility: Microsoft Excel 2016 or newer, and Google Sheets. License: single-user.








